| The 30-bed Long Term SCI facility will be operationally and physically integrated with the existing acute SCI center at the Dallas campus. The new two-story warehouse will have office space on the entire second floor. And Building 2 will be renovated for a new linen holding area. The three projects will be completed in the years 2025 through 2027. |